---Advertisement---
Abu Dhabi Dubai Sharjah Transportation Travel UAE Living UAE News

Dubai New Fourth Corridor Road Project: Route Details, Phases, and Travel Time Cuts

September 18, 2026 12:09 AM
dubai new fourth corridor road project
---Advertisement---

Published: Friday, 18 September 2026, at 12:08 am| Dubai | Edited: Friday, 18 September 2026, at 12:18 am

Dubai new fourth corridor road project was officially announced by the Dubai government to streamline travel across the emirates. As someone who tracks regional transport updates closely, I found that this major highway expansion promises to cut journey times drastically for daily commuters. Read on to discover all the key details, route phases, and features of this groundbreaking project.

ALSO READ:

Dubai New Fourth Corridor Road Project: Complete Route and Phase Guide

Comprehensive guide to the 80km highway linking Sharjah, Dubai, and Abu Dhabi.

dubai new fourth corridor road project

Crown Prince Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum approved this massive strategic initiative to strengthen inter emirate connectivity.

  • Strategic Significance: Serves as the fourth major corridor connecting the emirates, joining Sheikh Zayed/Al Ittihad Road, Sheikh Mohammed bin Zayed Road, and Emirates Road.
  • Economic Boost: Facilitates smooth commercial and logistics transport across key economic zones.
  • Urban Support: Keeps pace with rapid urban expansion and long term population growth.

Route Overview and Strategic Connections

Key landmarks and geography along the 80km stretch.

From my route analysis, this project links major national developments while diverting heavy through traffic away from congested city hubs.

  • Start and End Points: Connects Al Shanouf Road in Sharjah directly to Al Faya Road in Abu Dhabi through Dubai.
  • Landmarks Served: Passes through Al Maktoum International Airport, Al Marmoom Desert Conservation Reserve, and Al Wohoosh Desert Conservation Reserve.
  • Multimodal Links: Integrates seamlessly with the Etihad Rail network and key residential development communities.

Fourth Corridor Phase 1 Details

First 30km stretch specifications and investments.

dubai new fourth corridor road project

The initial stage focuses on creating high capacity transit between Sharjah and central Dubai routes.

  • Route Coverage: Covers approximately 30km from Al Shanouf Road in Sharjah to Dubai–Al Ain Road.
  • Investment: Costs around Dh3.5 billion for complete construction.
  • Road Capacity: Features a 12 lane through corridor carrying up to 24,000 vehicles per hour in both directions.
  • Population Reach: Serves an estimated 600,000 residents once fully operational.
  • Time Savings: Reduces journey times by 60 %, turning a 35 minute commute into just 14 minutes.
  • Infrastructure Specs: Includes 55 lane kilometres of at grade roads, 2.5km of tunnels, and 21km of bridges and ramps.
  • Road Upgrades: Widens Dubai–Al Ain Road from three to four lanes in each direction between Emirates Road and Lehbab Road, alongside upgrades to four major intersections.

ALSO READ:

Fourth Corridor Phase 2 Features

Second 50km extension details and reach.

The second stage extends the highway seamlessly towards the Abu Dhabi border to ease regional travel.

  • Route Coverage: Extends 50km to connect Dubai–Al Ain Road with Al Faya Road in Abu Dhabi.
  • Capacity: Features 12 lanes across both directions handling 24,000 vehicles per hour.
  • Time Savings: Cuts travel time by 52%, reducing a 50 minute journey down to 24 minutes.
  • Population Reach: Serves approximately 3.1 million people across expanding districts.
  • Infrastructure Specs: Includes 190 lane kilometres of at grade roads, 3.5km of tunnels, and 157km of bridges and ramps.

Traffic Relief and Engineering Scope

Total structural components and congestion management.

dubai new fourth corridor road project

I noticed that the design places heavy emphasis on structural excellence to eliminate bottle necks across urban zones.

  • Structural Highlights: Incorporates a grand total of 72 bridges, 17 tunnels, and 45 stormwater drainage culverts.
  • Truck Diversion: Redirects heavy freight trucks away from city streets to boost overall road safety.
  • Network Relief: Relieves heavy pressure on existing routes like Sheikh Mohammed bin Zayed Road and Emirates Road.

Phase Comparison Overview

Direct comparison of Phase 1 and Phase 2.

To help you understand how each stage unfolds, here is a breakdown comparing the key parameters of both construction phases.

FeaturePhase 1Phase 2
Distance30km50km
ConnectsAl Shanouf Rd to Dubai–Al Ain RdDubai–Al Ain Rd to Al Faya Rd
Travel Time Cut35 mins to 14 mins (60% cut)50 mins to 24 mins (52% cut)
People Served600,000 residents3.1 million residents
Cost / ScopeDh3.5 BillionFull 12 lane extension
https://twitter.com/rta_dubai/status/2100280421103927330/video/1

ALSO READ:

Conclusion

This ambitious highway project will reshape regional travel, making everyday commutes faster and far safer for everyone in the UAE.

FAQs

What is the total length of the New Fourth Corridor?

The entire highway stretches approximately 80km across the emirates.

Which emirates does the new corridor connect?

It directly connects Sharjah, Dubai, and Abu Dhabi.

How much travel time will Phase 1 save?

Phase 1 reduces a 35 minute journey down to 14 minutes.

How many lanes will the new corridor feature?

The corridor features 12 lanes in total across both directions.

Will the corridor handle heavy cargo transport?

Yes, it diverts heavy trucks away from crowded urban centers.

Ash Ali

Ash Ali is a trusted, experienced sports and lifestyle news expert at UAECentre.com, bringing reliable insights, the latest updates, and in-depth coverage of the events and trends influencing the UAE and beyond. Reach Ash Ali through info@uaecentre.com

Join WhatsApp

Join Now

Join Telegram

Join Now

Related Stories

Leave a Comment